新2代理网址(www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。
KUALA LUMPUR: HSS Engineers Bhd's unit HSS Integrated Sdn Bhd has been awarded a RM16.6mil variation order (VO) to provide supervising works for Section 9 of the East Coast Rail Link (ECRL) from Serendah to Port Klang.
In a statement, the engineering consultant said the 53.5km section consists of tunnels, viaducts, at-grade sections and stations.
The VO pertains to the letter of appointment HSS Engineers received from China Communications Construction (ECRL) Sdn Bhd in December 2017 to provide supervising consultancy services for infrastructure works from Ch 0+000 to Ch 231+500 for a total contract sum of RM82.5mil.
,,哈希108竞彩平台(www.hx198.vip)采用波场区块链高度哈希值作为统计数据,游戏数据开源、公平、无任何作弊可能性,哈希108竞彩平台开放单双哈希、幸运哈希、哈希定位胆、哈希牛牛等游戏。
According to HSS Engineering executive director Sharifah Azlina Raja Kamal Pasmah, overall construction works for the ECRL were well underway with reported progress of 28.57% as at April 2022.
"We are heartened by the opportunity to reprise and even expand our role to carry on the project's momentum, especially in the crucial linkage in the Klang Valley," she said.
The project works are targeted for completion by the fourth quarter of the financial year ended Dec 31, 2027.
With the latest contract win, the group said its unbilled orderbook stands at RM530mil year-to-date, which will provide earnings visibility until 2027.
评论列表 (1条)
2023-02-17 00:02:44
她与排舞师麦秋成年头奉子闪婚,早前受访时示意下月是预产期,惟BB女却拣提早于今个月18日,就已经出生,「赶及」庆祝父亲节!走心的夸你